Customization: | Available |
---|---|
After-sales Service: | Engineers Available to Service Machine Overseas |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Flat Custom Mask Making Machine
1.Locating the pattern position through the color code sensor, makes the mask appearance
beautiful and no difference.
2.It adopts adjustable structure of nose bar, which can cooperate with different sizes
and styles of molds.
3.After the body mask is completed, it will be automatically transported to the ear loop
welding machine.
4.The pull rod type ear loop welding structure makes higher efficiency.
5.It is a fully automatic production with stable operation, less labor costs, High quality
and efficiency.
This machine is a flat face mask equipment with customized patterns on the non-woven
material. The whole machine adopts PLC and servo motor control operation, different
sizes and style can be customized according to the market demand, by locating the
pattern position through the color code sensor.
Machine Size | 6150*3350*2300mm |
Output | 80-100pcs/min |
Voltage | 220 V |
Power | 5.5 KW |
Pressure | 6 kg/cm² |
Special requirement | Mask size need to be fixed |
Fuselage material | Aluminium alloy |
Note | Packing machine optional |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer's requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer how
to do the machine maintenance.
5) Prepare customer's feedback tracking within one week after machine installation until meet
customer's satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A: We provide 1 year guaranty and technical support lifetime. All machine's parts can be
replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For the first
installation, engineer will be sent to set machine and do the machine training as long as
manual instruction.For the further problems come out, we can provide video instruction
as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM),
the lead time is 35-55 days.