Customization: | Available |
---|---|
Warranty: | 1year |
Application: | Making 3D Mask with Packing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Wholesale Automatically CCD Detection With Auto Packing Of The 3D Mask Machine
1.high automation with PLC, photoelectric detection for the raw material feeding to avoid
wasting and with high stability.
2.import cutting roll, no burr and durable in use
3.Material feeding by sever motor , accurate in ear loop position adjustment and welding.
small in size, solid and rustproof performance with aluminum alloy frame rack.
4.20k ultrasonic ear loop welding, strong in welding portion and pulling.
5.Patent equipment, leading technology,mature process,stable quality and high efficiency.
A popular mask in Korea, It is fully automatic production line instead, waste collection
device is available.This kind of face mask machine also be called 3D mask or fish type
mask machine. auto packaging system and CCD detection function will be optional.
easy opearation and as well as compact size.
Machine Size | 4056*5581*1826mm |
Output | 40pcs/min |
Voltage | 220 V/380V |
Power | 4.5KW |
Pressure | 0.6 Mpa |
Fuselage material | Aluminium alloy |
Special requirement | Mask size need to be fixed |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer's requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer
how to do the machine maintenance.
5) Prepare customer's feedback tracking within one week after machine installation until
meet customer's satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A: We provide 1 year guaranty and technical support lifetime. All machine's parts can
be replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For
the first installation, engineer will be sent to set machine and do the machine training
as long as manual instruction. For the further problems come out, we can provide
video instruction as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by
customer(OEM), the lead time is 35-55 days.