Sponge Sticking Machine for Activated Charcoal Carbon Cabin Air Filter
1. Adopting PLC and servo motor to control machine, which greatly improve the production
efficiency and product aesthetics.
2. Only need one person to operating which greatly save the labor costs.
3. Applicable to products of various specification products , only need to replace the mould.
The system has a storage function, which can store a variety of product data, which
is convenient for data production,Automatic induction and transmission operation, fast
distribution output operator only needs to put the semi-finished filter screen (more than
5 pieces/time)The operating cycle time is within 15S~30S/piece, including the time
for operators to place materials normally.The carrier is light, not easy to deform,
and the scope of application is adjustable, adapting to the adjustment needs of products
of different specifications,System positioning and recognition are accurate, fast and
smooth. Sponge is supplied in roll material mode, and the diameter of the reel is about
600mm (40m material).
Special requirement |
Product size should be less than 300*260*40mm |
Output |
10-16pcs/min |
Drive method |
Servo motor, cylinder |
Fuselage material |
Aluminum alloy |
Machine size |
1360mm×1590mm×1360mm |
Voltage |
Data220V/50HZ |
Air pressure |
0.6mpa |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer's requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer
how to do the machine maintenance.
5) Prepare customer's feedback tracking within one week after machine installation
until meet customer's satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A: We provide 1 year guaranty and technical support lifetime. All machine's parts
can be replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor.
For the first installation, engineer will be sent to set machine and do the machine
training as long as manual instruction.For the further problems come out, we
can provide video instruction as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by
customer(OEM), the lead time is 35-55 days.