Customization: | Available |
---|---|
Application: | Machinery, Toy, Gearbox |
Function: | Speed Increase, Drive |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
China Factory Wholesale Full Automatic Plastic Friction Gearbox Assembly Machine
1. Automatically Deliverying all the parts of gearbox by vibration.
2. Adopts the latest technology to assembly all the parts by full automatically.
This is a special fully automatic assembly machine for 2mm inertia gear box toys.
It adopts the latest technology to assembly the bottom cover, small gearbox, gearbox,
iron shaft and upper cover by fully automatic,which saves labor and improves work efficiency.
The whole production line is from feeding, sorting, assembling, to optical fiber detection
of accessories,rejecting defective products, and finally to the discharge of qualified finished
products, realizing automatic production, stable and efficient, high compatibility, and can
effectively improve market competitiveness.
Machine Size | 1390*1800*1950mm |
Output | 1200-1440pcs/h |
Voltage | 220 V |
Power | 12 KW |
Pressure | 0.6 Mpa |
Special requirement | Size need to be fixed |
Fuselage material | Aluminium alloy |
Note | Optional machine, online detection is available |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer's requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer
how to do the machine maintenance.
5) Prepare customer's feedback tracking within one week after machine installation until
meet customer's satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A: We provide 1 year guaranty and technical support lifetime. All machine's parts can be
replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For the first
installation, engineer will be sent to set machine and do the machine training as long as
manual instruction. For the further problems come out, we can provide video instruction
as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer
(OEM), the lead time is 35-55 days.