New improving product consistency cotton face towel rewinding machine
1.This machine adopts vibrating bowl feeder and thetransmission mechanism to perfectly
connect thehost machine to realize automatic.
2.Adopts PLC programming control to achieve high degree of automation, low failure rate
andlow noise.
3.Using ultrasonic welding technology making the finished product is beautiful, hygienic
and environmentally friendly.
4.The mechanical structure is made of aluminum alloy andthe key parts are made of stainless
steel which has the advantages of no rust, durability.
5.Fully automatic production line with high capacity and the labor cost is greatly reduced.
This is an automatic equipment for producing disposable face towels. The whole machine
adopts PLC and servo motor to control the operation, Use the vibrating bowl feeder and the
transmission mechanism to perfectly connect the host machine to realize automatic winding+
cutting + automatic upper and lower semi-finished face towel rolls. This machine has extremely
high production efficiency, and can have multiple devices for one operator, effectively reducing
manual operation costs.
Control Mode |
PLC Control |
Machine Size |
2150*2320*1750mm |
Capacity |
8-12rolls/min |
Voltage |
220V |
Pressure |
0.6Mpa |
Power |
2.2KW |
Special Requirement |
Some parts should be changed fordifferent sizes of products |
1. Provide 24-hour service hotline.
2. Reply and find out solution within the shortest time according to customers' requirement.
3. Provide on call services to help customer solve problems.
4. Provide free machine installation as well as commissioning, and inform customer how
to maintain the machine.
5. Prepare customer's feedback tracking within one week after machine installation until
customers satisfy.
6. Provide one year guaranty and lifetime maintenance.
1. Q: How is the after-sale service?
A: We provide 1 year guaranty and technical support lifetime. All parts of the machine can be
replaced for free within 1 year if broken. (excluding error operation)
2. Q: Is it difficult to install the machine?
A: The work shop shore prepare full facility such as power and air compressor. For the first
installation, our engineer will be sent to set machine and do the machine training as long
as manual instruction. If the further problems come out, we can provide video instruction
as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer
(OEM), the lead time is 35-55 days.