Customization: | Available |
---|---|
Warranty: | 1 |
Application: | Compressed Facial Mask |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Compressed Face Terry Towel Coin Towels Travel Hotel Magic Tablet Towels Machine
1. High output, small in size and floor area.
2. Adopts PLC and photoelectric detection.
3. High stability and efficiency and low errors.
4. Adopts automatic tension controller, and adjustable ultrasonic welding.
5. Beautiful, strong and rust proof with the aluminum alloy structure.
This is an automatic equipment for producing disposable compressed towels. The
machine uses an automatic feeding material and compression moudel reflow mechanism,
equipped with Mitsubishi FX-3U series intelligent control system and man-machine
information exchange interface function, make the machine more safe, stable and efficient
in operating. And it can realize single layer or multi-layers materials can be automatically
compressed at the same time with a stable speed 70-90PCS/min. Equipment with high
production efficiency, and can have multiple devices for one operator, effectively reducing
manual operation costs.
Machine Size | 3100*1200*2000mm |
Output | 30-100 pcs/min |
Voltage | 380 V |
Power | 14.5 KW |
Pressure | 0.6 Mpa |
Fuselage material | Aluminium alloy |
Note | Different sizes&shapes by changing mould |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer's requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer
how to do the machine maintenance.
5) Prepare customer's feedback tracking within one week after machine installation
until meet customer's satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A: We provide 1 year guaranty and technical support lifetime. All machine's parts
can be replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor.
For the first installation, engineer will be sent to set machine and do the machine
training as long as manual instruction. For the further problems come out, we
can provide video instruction as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized
by customer (OEM), the lead time is 35-55 days.