Customization: | Available |
---|---|
After-sales Service: | Engineers Service Overseas |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
China Half Face Piece Particulate Filter Pad Making Machine
1. Adopt Precision mold punching
2. Automatic feeding material of vibrating disc with stable affection
3. Using German ultrasonic welding technology which can weld multi-layers materials
at the same time
4. Using a precision laser die to ensure that the cut of the finished product is neat, beautiful
in appearance and error-free in size
5. Adopt automatic collection mechanism which is stable and reliable
This is a fully automatic round filter pad making machine, which can automatically
complete feeding, cutting holes, feeding supporting frame, welding. Needn't manual
operation, not only can save 3-5 manpowerbut also improve efficiency and product
quality. Using PLC control system and touch screen setting to makethe machine
operating more easier and faster.
Machine Size | 5650*1795*1670mm |
Output | 10-20pcs/min |
Voltage | 220 V |
Power | 2.9 KW |
Pressure | 0.6 Mpa |
Special requirement | Mask size need to be fixed |
Fuselage material | Aluminium alloy |
Note | Packing machine optional |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer's requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer
how to do the machine maintenance.
5) Prepare customer's feedback tracking within one week after machine installation until
meet customer's satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A: We provide 1 year guaranty and technical support lifetime. All machine's parts can
be replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For
the first installation, engineer will be sent to set machine and do the machine training
as long as manual instruction. For the further problems come out, we can provide
video instruction as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by
customer(OEM), the lead time is 35-55 days.