• Fully Automatic Production Equipment Hotel Slipper Making Machine
  • Fully Automatic Production Equipment Hotel Slipper Making Machine
  • Fully Automatic Production Equipment Hotel Slipper Making Machine
  • Fully Automatic Production Equipment Hotel Slipper Making Machine
  • Fully Automatic Production Equipment Hotel Slipper Making Machine
  • Fully Automatic Production Equipment Hotel Slipper Making Machine

Fully Automatic Production Equipment Hotel Slipper Making Machine

After-sales Service: 1 Year
Warranty: 1 Year
Condition: New
Certification: CE
Power Supply: Pneumatic
Applicable Material: Fabric
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
HY200S-06
Function
Shoemaking Line
Control Mode
Transducer Control
Capacity
80-100PCS/Min
Weight
1200kg
Technology
Technology Support
Advantage
Easy Operation High Efficiency
Feature
Save Labor
Applicable Industries
Hotels, Manufacturing Plant, Home Use, Retail
Machinery Test Report
Provided
Video Outgoing-Inspection
Provided
Key Selling Points
Automatic
Automatic Grade
Automatic
Supply Ability
30 Set/Sets Per Month
Pressure
0.6 MPa
Power
5200kw
Transport Package
Wooden Packing
Specification
L6575*W1000*H1717MM
Trademark
Hengyao
Origin
Guangdong, China
Production Capacity
30 Set/Sets Per Month

Product Description


Fully automatic production equipment hotel slipper making machine

Fully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making Machine
Fully Automatic Production Equipment Hotel Slipper Making Machine
1. Ultrasonic rolling soles can effectivelystrengthen friction and hardness.
2. Rubber plate rolling printing process, patternscan be changed at any time.
3. Mold proportion molding, so the size can becustomized.
4. Printing function is optional.
5. Full automatic production, and the rate is stableand efficient, reduce labor cost.

Fully Automatic Production Equipment Hotel Slipper Making Machine     It is an automatic machine to produce elastic non-woven slipper. The products is applied
to hospital, hotel, or spa place.Through ultrasonic technology combined with automatic control components, the products can realize the automatic production of each process, What's more ,
product size and shape can be customized according to demand, and can print personalized
patterns to meet different needs, low-cost, high efficiency and high quality production.

Fully Automatic Production Equipment Hotel Slipper Making Machine
Machine Size 6575*1000*1717mm
Output 80-100pcs/min
Voltage 220V/380V
Power 5.2KW
Pressure 0.6 Mpa
Fuselage material Aluminium alloy
Special requirement Printing function is optional
Fully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making MachineFully Automatic Production Equipment Hotel Slipper Making Machine1. Provide 24-hour service hotline.
2. Reply and find out solution within the shortest time according to customers' requirement.
3. Provide on call services to help customer solve problems.
4. Provide free machine installation as well as commissioning, and inform customer how
    to maintain the machine.

5. Prepare customer's feedback tracking within one week after machine installation until
    customers satisfy.

6. Provide one year guaranty and lifetime maintenance.
Fully Automatic Production Equipment Hotel Slipper Making Machine
1. Q: How is the after-sale service?
    A: We provide 1 year guaranty and technical support lifetime. All parts of the machine can be
        replaced for free within 1 year if broken. (excluding
 error operation)


2. Q: Is it difficult to install the machine?
    A: The work shop shore prepare full facility such as power and air compressor. For the first
         installation, our engineer will be sent to set machine and do the machine training as long
         as manual instruction. If the further problems come out, we can provide video instruction
         as well.


3. Q: What's the machine lead time?
    A:  For the standard machines, we can delivery within 30 days. If it is customized by customer
         
(OEM), the lead time is 35-55 days.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
72
Year of Establishment
2016-03-30