Customization: | Available |
---|---|
Warranty: | 1 Year |
Application: | Nonwoven Surgical Gown |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The automatic machine is mainly used to produce reinforced surgical gown. Equipped
with automatic feeding material, reinforced patches dispensing, straps welding, It can
reduce lot of labor cost and increase efficiency. The medical gown machine can realize
the automatic production of each process with automatic control components. Meanwhile,
It is so smart and high efficient that it just need one worker to operate. The size of visitor
gown can be customized according to customers' demand.
Machine Size | L12000*W2500*H2100mm |
Output | 20-25 pcs/min |
Voltage | 220 V |
Power | 15 KW |
Pressure | 0.6 Mpa |
Fuselage material | Aluminium alloy |
Special requirement | Different sizes by changing mould |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer's requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer how
to do the machine maintenance.
5) Prepare customer's feedback tracking within one week after machine installation until meet
customer's satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A: We provide 1 year guaranty and technical support lifetime. All machine's parts can be
replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For the first
installation, engineer will be sent to set machine and do the machine training as long as
manual instruction. For the further problems come out, we can provide video instruction
as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer
(OEM), the lead time is 35-55 days.