Automatic Folding and Packing Machine for Disposable Pants of SPA Pants Making Machine
1.Automatically feeding the material into themodule.
2.Adopts automatic feeding material andcompression model reflow mechanism.
3.Compatible with both briefs and shortsproduction.
4.Molds are rowed on both sides, which savesmaterial and has higher efficiency.
5.Molds are made one to one according todrawings, which is more durable.
This machine is specialized equipment for producing disposable pants/briefs.
The product is suitable for hospitals, saunas and beauty industries, etc. The
machine adopts ultrasonic welding, fast speed, strong welding, and fully
automated from raw materials to finished products. The whole machine only
needs one person to operate, which greatly saves labor costs.
Machine Size |
1890*880*1200mm |
Output |
20-25 pcs/min |
Voltage |
220V/380V |
Power |
1.2 KW |
Fuselage material |
Aluminium Alloy |
1. Provide 24-hour service hotline.
2. Reply and find out solution within the shortest time according to customers' requirement.
3. Provide on call services to help customer solve problems.
4. Provide free machine installation as well as commissioning, and inform customer how
to maintain the machine.
5. Prepare customer's feedback tracking within one week after machine installation until
customers satisfy.
6. Provide one year guaranty and lifetime maintenance.
1. Q: How is the after-sale service?
A: We provide 1 year guaranty and technical support lifetime. All parts of the machine can be
replaced for free within 1 year if broken. (excluding error operation)
2. Q: Is it difficult to install the machine?
A: The work shop shore prepare full facility such as power and air compressor. For the first
installation, our engineer will be sent to set machine and do the machine training as long
as manual instruction. If the further problems come out, we can provide video instruction
as well.
3. Q: What's the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer
(OEM), the lead time is 35-55 days.